Electrical Appliance Testing Equipment

IEC 60335-2-15 Clause 19.101 Cordless Electric Kettle Comprehensive Life Tester

Brand: SZBONAD

Product Number: BND-KCLT

The IEC 60335-2-15 Clause 19.101 Cordless Electric Kettle Comprehensive Life Tester is a fully automated testing system designed to evaluate the durability, reliability, and safety compliance of cordless electric kettles for household and commercial use. Developed in strict accordance with IEC 60335-2-15 standards (Clauses 19.101, 19.102, 22.103), this equipment simulates real-world usage scenarios to ensure kettles meet rigorous international safety and performance benchmarks. Featuring advanced PLC control (Mitsubishi) and a user-friendly 7-inch color touchscreen interface, the tester automates critical processes like water injection, boiling, cooling, and plug cycling, delivering precise and repeatable results for manufacturers and quality assurance labs.

GET A QUOTE

IEC 60335-2-15 Clause 19.101 Cordless Electric Kettle Comprehensive Life Tester – BONAD Test Equipment

Standards:

  • Primary Standard:
    IEC 60335-2-15 Clause 19.101 (Dry Boiling Test), 19.102, 22.103
  • Additional Compliance:
    Aligns with safety and durability requirements for household and similar electrical appliances under IEC 60335-1.

Applications:

  • Comprehensive Life Testing: Simulates thousands of boiling cycles to assess kettle longevity.
  • Dry Boiling & Cooling Tests: Evaluates thermal protection mechanisms during overheating.
  • Plug Durability Testing: Tests plug-in cycles (with/without power) for mechanical and electrical resilience.
  • Reliability Validation: Verifies performance under variable loads (0.85× to 1.15× rated power).
  • Quality Assurance: Ensures compliance with global safety certifications for consumer appliances.

Features:

  1. Fully Automated Operation:
    • Auto water injection, boiling, pouring, and cooling cycles.
    • Supports up to 100 fully automated boiling cycles with programmable stop conditions.
  2. Multi-Test Modes:
    • Dry Boiling: Self-cooling or water-cooled modes to test thermostat reset functionality.
    • Plug Testing: Cyclic plug insertion/removal with or without electrical load.
    • Circulating Boiling: Simulates repeated boiling and pouring for real-world usage analysis.
  3. Adjustable Parameters:
    • Voltage, current, and load adjustments to mimic power fluctuations (0.85×–1.15× rated input).
    • Customizable water volume and cooling intervals for precise test customization.
  4. Advanced Control System:
    • Mitsubishi PLC ensures high-precision control and data logging.
    • 7-Inch Touchscreen Interface for real-time monitoring and parameter adjustments.
  5. Safety & Efficiency:
    • Auto-shutdown upon test completion or failure detection.
    • Robust construction for long-term industrial use.

Technical parameters:

Model BND-KCLT
Electric control method PLC intelligent integrated control, 7-inch man-machine touch interface operation
Drive method Cylinder drive
Sample clamping method Mechanical clamping with centripetal centering fixture
Basis functions Including dry boiling (self-cooling), dry boiling (water-cooled), plug (with electricity), plug (without electricity), and circulating boiling water:
1. Dry boiling (self-cooling):start→pour water→reset→start dry boiling→dry boiling end (thermostat jumps off)→natural cooling until the temperature controller reset→cycle dry boiling;
2. Dry boiling (water-cooled): start→pour water→start dry boiling→dry boiling ends (thermostat jumps off) →add water to cool until the thermostat reset (water volume adjustable) →pour water→circular dry burning;
3. Plug (without power): start→start plug (cycle work)
4. Plug (powered): start→add water to the kettle (adjustable water volume) →start plugging with electricity→cycle work→change the water at a fixed number of times→cycle in this way
5. Circulating boiling water: start→pouring→reset→add water (water volume can be set) →heating and boiling water→after the water is boiled (the thermostat jumps on) →automatic pouring→reset→cycle work
Load Each station can display the voltage and current of sample
Conduction count Fault alarm and shutdown when non-conduction
Test times 0-999999, when the set number of times is reached, the alarm will prompt and stop
Main configuration The frame is made of aluminum alloy square tube; the door panel and the box are painted; the main water contact parts are made of 304 stainless steel or aluminum alloy
Air source This machine needs to use compressed air, the air pressure is 0.5MPa -0.7MPa
Test mode 1. Boiling mode
2. Plug mode (with electricity)
3. Plug mode (without electricity)
4. Hot and cold dry burning mode (water cooling)
5. Hot and cold dry mode (self-cooling)
The main parameters of control A: Water pouring time: 1~9999(s),adjustable; Pouring reset: 1~9999(s), adjustable
B: Adding water time: 1~9999(s), adjustable; Cooling time: 1~9999(s), adjustable
C: Plug with electricity: 1~9999 (s) adjustable; Plug without electricity: 1~9999 (s) adjustable
D: Rest setting: 1~9999 (times),adjustable; Rest time: 1~9999 (s), adjustable
E:Times setting: 1~9999 (times), adjustable; Actual count: 1~9999 (times), adjustable
Alarm A: Count to alarm
B: No power alarm (Boil water, dry boil, plug with electricity)
C: When the equipment fails, manual operation can be adopted, and the independent operation of each station does not affect each other.

Why Choose This Tester?

This equipment streamlines compliance with IEC 60335-2-15 standards, reducing manual intervention and human error. Its ability to simulate extreme conditions—such as dry boiling, rapid cooling, and power fluctuations—ensures your products withstand real-world demands while meeting global certification requirements. Ideal for R&D labs, manufacturing facilities, and third-party testing centers, it delivers unmatched accuracy and efficiency in appliance validation.

IEC 60335-2-15 Clause 19.101 Cordless Electric Kettle Comprehensive Life Tester - 2